Level Best Concrete Flooring kick off the festive period with a record number of warehouse dilapidation projects on the go. With five live dilapidation sites running concurrently throughout the month, the warehouse floor refurbishment teams at Level Best are at full tilt.
Brief detail of the floor dilapidation works on these sites is listed below:
Concrete floor repairs, joint sealant, crack repairs, patch repairs, racking bolt removal and warehouse floor renovation at Ryton, Coventry
External yard replacement, including new drainage and removal of poor sub base material at Daventry, Northamptonshire
Floor repairs at waste recycling plant at Wilten plant, Redcar, Teeside
Repairs to floor on warehouse floor revamp in Canning Town, London. These works include repairs caused by impact damage from fork lift trucks, floor joint repairs, floor re sealing to stop concrete dusting and racking bolt removal. Concrete floor polishing at another warehouse in Milton Keynes, Bedfordshire along with heavy duty floor joint replacement.