Warehouse floor joint repairs, Great Bear, Banbury

These aisles in the VNA section of the warehouse were showing signs of major degradation and beginning to cause damage and expense to fork lift trucks.   Level Best was contacted to carry out an initial survey to the entire footprint of the warehouse floor area. The floor inspection team in conjunction with Great Bear staff agreed the locations which required the most immediate attention and floor repairs were co-ordinated in a timely manner to suit operations within the warehouse. 

Upon completion of the floor joint repair works Level Best was contacted to organise more floor repairs to the internal warehouse and external concrete yard areas.

Damaged floor joint in warehouse
Damaged floor joint removed in preparation for repairs
Primer is applied to area in preparation for foundation
Foundation applied to joint
Joint repair system installed to floor
Joint repair complete and ready for fork lift trafficking
Comments are closed.