This large warehouse floor located in Doncaster, South Yorkshire required repairs carrying out over their Christmas shutdown period. Level Best Concrete Flooring was instructed to carry out the numerous repairs to the concrete floor which included, cracks repairs, joint repairs, the removal of racking fixings, line marking removal and floor surface repairs. The concrete flooring contractors repair teams finished their Christmas turkey and commenced works 6am on the 27th December in order to complete the floor repair works on time and on schedule without hindering the clients progress.
The floor repair project went that well that the client has now instructed the warehouse floor renovation contractors for their Easter shutdown period as well.
If you would like to know more information on how Level Best Concrete Flooring can assist you please contact us on 01405 819199 or e mail enquiries@levelbestconcreteflooring.co.uk