Level Best making excellent progress on their next major refurbishment project

Level Best Concrete Flooring are continuing to make excellent progress in Crick near Daventry, Northamptonshire and are well ahead of main contract programme.

As part of the end of tenancy dilapidation works in Daventry, Northamptonshire, Level Best Concrete Flooring will be full depth core drilling removing all the racking bolts throughout the different warehouse areas. To date approximately 3,000 previous tenant installed fixing and racking bolts have been removed full depth. Level Best operatives are now working behind infilling the resulting voids with an industrial-grade high-strength repair mortar. The repair product is ground down at a later date providing a seamless transition for the incoming tenant, a major British national retailer, at the start of their tenancy.

This racking and fixing bolt removal solution being demonstrated in Crick, Northamptonshire is a concrete floor repair solution Level Best continuously carry out. It provides Clients, Landlords, Industrial Property Agents and Building Surveyors with a solution that allows greater flexibility with the letting of the unit, providing unlimited racking potentials and layouts due to the heavy-duty solution littered throughout the slab. It also provides the Landlord and incoming tenant with piece of mind that the floor is not going to require constant care and attention, improving operational experiences.

Level Best Concrete Flooring will continue to remove fixing bolts throughout the warehouse as well as carrying out a variety of other concrete floor repair solutions in Daventry, Crick.

Full depth diamond core drilling continues in Crick near Daventry, Northamptonshire
Comments are closed.