July workload for floor dilapidation contractors

Throughout the month of July 2022 Level Best Concrete Flooring are very busy working on six live floor renovation projects throughout the United Kingdom.  A brief summary of those floor renovation schemes is listed below:

Removal and replacement of external concrete yard at DIRFT, Daventry, Northamptonshire 

Floor cleaning and polishing at an existing warehouse in Milton Keynes, Buckinghamshire 

Floor repairs and racking bolt removal at Coventry warehouse in Warwickshire

Floor planing, floor repairs, and slab infills at former retail store in Edmonton, North London.

Above is a brief summary of the types of floor refurbishment projects we are working on in July 2022 here at Level Best Concrete Flooring, should you wish us to carry out a survey on your warehouse concrete floor slab or external concrete yard, then please feel free to contact us at enquiries@levelbestconcreteflooring.co.uk and or telephone 01405 819199 and ask to speak to one of our estimating team members.

Refurbishment dilapidation survey being carried out in Minworth, Birmingham
Floor surveys in warehouse carried out by Level Best Concrete Flooring
External concrete yards surveyed by Level Best Concrete Flooring
Comments are closed.