July workload for dilapidation surveying contractors, Level Best

The month of July 2023 begins with numerous floor refurbishment contracts. Below is a brief list of some of the floor renovation schemes the industrial warehouse floor refurbishment contractor is working on:

  • Floor grinding to remove tile adhesive and other coatings at retail park in Banbury, Oxfordshire
  • Floor polishing and joint replacement in Bromley, South London
  • Overlay concrete floor slab in warehouse in Corby, Northamptonshire
  • External yard repairs in Pineham, Northampton, Northamptonshire
  • Joint repairs to warehouse aisles in Livingston, Scotland
  • Cold store floor joint repairs in Warrington, Cheshire
Warehouse floor survey in Kettering, Northamptonshire
Floor renovation team from Goole, East Yorkshire
Warehouse dilapidation surveys in London
Comments are closed.