Following completion of the previous tenant’s occupancy, Level Best Dilapidations carried out a specialist floor survey in Salford, Greater Manchester to ascertain the condition of the dilapidated slab and advise the client and project team on the best course of remedial action.
Industrial remedial works commenced with racking bolt removal via core drilling methods and diamond drilling alongside removal of the previous tenant’s specific applied line marking, floor paints and demarcations.
A final clean, polish and seal system was carried out to the surface of the slab. This environmentally friendly revolutionary system increases structural capacity and appearance whilst reducing life cycle maintenance costs. The final finish as seen below in Salford, Greater Manchester is excellent and improves the overall building performance.