Level Best have mobilised to their latest industrial concrete flooring dilapidation, refurbishment, and repair project in the heart on the London borough of Hillingdon in Uxbridge, London on behalf of both a repeat London-based client and building contractor.
The works will involve all Level Best’s usual floor repair works ranging from localised concrete floor joint repairs to full depth diamond removal and insitu racking and fixing bolt and subsequent industrial-grade infilling. The works will be completed on a return visit with the final enhancing industrial concrete floor polishing works.
Level Best are running multiple industrial floor renovation teams on projects throughout the country due to current workload and market demand. This project in Uxbridge London will be running alongside projects in Daventry Northamptonshire, Ryton-on-Dunsmore West Midlands and Country Durham North-East England.